Comer Construction is known for it’s complete site preparation packages. The project going on at The Calvert School is no exception. Working with The Mullan Contracting Company, Comer Construction is providing:
- Demolition and Clearing
- Excavation
- Sediment Control
- Stormwater Management
- Retaining Walls
- Concrete Work: Steps, Walls, Sidewalk, Curb, and Ramps
- Paving
- Installing Utilities: Storm Drain, Water, and Sewer
The jobsite started in September of 2021 and is slated to be complete in the Fall of 2022.